We know your urgency. Call us: +91 98554 45055
Vishwakarma Technical Services (VTS)
Pune, India · RLA & NDT specialists
Home / Services / RLA as per Codes and Tables
RLA and Engineering Assessment

RLA as per Applicable Codes, Standards and Assessment Tables

RLA reported in the Indian-compliance table study format.

Service overview

This service delivers the remaining life assessment as a tabulated study based on the applicable codes, standards and assessment tables. Findings are laid out in a clear table so engineers, owners and inspecting authorities can review them.

Purpose and industrial applications

  • Boilers where the owner needs a table-based RLA study
  • Submission to the client or the inspecting authority
  • Comparing results across units or over time

Components and materials

  • Boiler tubes, headers and drums
  • Pressure parts and weld joints

Inspection methods and equipment

  • Thickness, hardness and metallography data
  • Assessment against the tables and criteria agreed for the equipment

See our equipment

Typical procedure

  1. Confirm the governing code, table and criteria
  2. Collect the inspection and test data
  3. Compile the data in the study format
  4. Assess each component against the criteria
  5. Issue the report and recommendations

Applicable codes and standards

The tables and criteria used depend on the equipment, material, service conditions and statutory requirements. We state the basis used in every report and do not apply one table to all equipment.

The applicable standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work.

Deliverables and reporting

  • Tabulated RLA study
  • Statement of the code and criteria used
  • Conclusions and recommended actions

Scope limitations and site requirements

  • Results are valid for the data and condition at the time of inspection
  • Not every table applies to every component or material

Frequently asked questions

Which table do you use?
The one that applies to your equipment and statutory situation. We confirm it with you before the study.
Is the report accepted by authorities?
Acceptance depends on the authority and requirement. We prepare the report to the agreed basis.
ISO 9001:2015Certified quality management
On-time complianceESIC, PF and MLWF awards
Safety firstPPE and LOTO kits in use
60+ page reportsDetailed documentation per project
IBR-certified weldersFor boiler pressure parts

Planning a shutdown or facing a breakdown?

We know your urgency. Tell us the problem and we will plan the right testing.

Send an enquiry
Send enquiry