We know your urgency. Call us: +91 98554 45055
Vishwakarma Technical Services (VTS)
Pune, India · RLA & NDT specialists
Home / Services / IBR Welding Services
Welding, Repair and Maintenance

IBR Welding Services

Welding on boiler pressure parts by IBR-certified welders.

Service overview

The Indian Boiler Regulations (IBR) require welding on boiler pressure parts to be done by certified welders. We provide IBR-certified welding technicians for boiler repair and tube replacement work.

Purpose and industrial applications

  • Tube and pressure-part welding on boilers
  • Repair welding after inspection
  • Welding during shutdown repairs

Components and materials

  • Boiler tubes and headers
  • Tube plates and drums
  • Other boiler pressure parts

Inspection methods and equipment

  • Welding to an approved procedure
  • Inspection and NDT of the finished welds

See our equipment

Typical procedure

  1. Confirm the procedure and welder certification
  2. Prepare and fit the joint
  3. Weld to the procedure
  4. Inspect and test the weld
  5. Record and hand over

Applicable codes and standards

The Indian Boiler Regulations (IBR) are statutory regulations. Procedure and welder qualification requirements depend on the boiler, the repair and the inspecting authority.

The applicable standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work.

Deliverables and reporting

  • Welded joints with inspection records
  • Welder and procedure details for the job

Scope limitations and site requirements

  • Procedure approval and statutory requirements must be met before work
  • Certification is held by individual welders and is job-specific

Frequently asked questions

What does IBR certification mean for a welder?
It means the welder is certified under the Indian Boiler Regulations for the type of welding on boiler pressure parts.
Are welder certification requirements confirmed before the job?
Yes. We confirm the certification and procedure requirements with you before the work starts.
ISO 9001:2015Certified quality management
On-time complianceESIC, PF and MLWF awards
Safety firstPPE and LOTO kits in use
60+ page reportsDetailed documentation per project
IBR-certified weldersFor boiler pressure parts

Planning a shutdown or facing a breakdown?

We know your urgency. Tell us the problem and we will plan the right testing.

Send an enquiry
Send enquiry