Service overview
We replace boiler tubes that are life-expired, damaged or leaking. The work includes removal of the old tube, preparation, fit-up, welding or expanding, and inspection of the new joints.
Purpose and industrial applications
- Replacement after thickness loss, leaks or damage
- Replacement identified through RLA
- Planned retubing during a shutdown
Components and materials
- Water-wall, boiler bank and economiser tubes
- Superheater tubes
- Tube-to-header and tube-to-tube-plate joints
Inspection methods and equipment
- Cutting, preparation and fit-up
- Welding or expanding as per the design
- NDT and inspection of the new joints
Typical procedure
- Identify and confirm the tubes to be replaced
- Remove the old tubes safely
- Prepare and fit the new tubes
- Weld or expand and inspect the joints
- Test and hand over
Applicable codes and standards
The Indian Boiler Regulations (IBR) apply to boiler pressure parts. Material and procedure follow the boiler design and the agreed scope.
The applicable standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work.
Deliverables and reporting
- Replaced tubes with joint inspection records
- Material and welding records
Scope limitations and site requirements
- Tube material and size must match the design
- Access to the tubes affects the time required
Frequently asked questions
How many tubes can be replaced in a shutdown?
That depends on access, tube locations and the time available. We plan this with you.
Can you supply the tubes?
Please discuss material supply with us at the enquiry stage so the scope is clear.
ISO 9001:2015Certified quality management
On-time complianceESIC, PF and MLWF awards
Safety firstPPE and LOTO kits in use
60+ page reportsDetailed documentation per project
IBR-certified weldersFor boiler pressure parts
Planning a shutdown or facing a breakdown?
We know your urgency. Tell us the problem and we will plan the right testing.
