We know your urgency. Call us: +91 98554 45055
Vishwakarma Technical Services (VTS)
Pune, India · RLA & NDT specialists
Home / Services / QA/QC Inspection
Quality, Audit and Consulting

QA/QC Inspection

Quality assurance and quality control inspection for fabrication and repair.

Service overview

QA/QC inspection checks that work is carried out to the approved drawings, procedures and quality plan, from material receipt to final dimensional and NDE checks.

Purpose and industrial applications

  • Fabrication and repair quality control
  • Stage-wise inspection against a quality plan
  • Final inspection before dispatch or return to service

Components and materials

  • Materials and welds
  • Fabricated components
  • Repaired equipment

Inspection methods and equipment

  • Visual and dimensional inspection
  • NDE as required by the plan
  • Records and report review

See our equipment

Typical procedure

  1. Review the quality plan and acceptance criteria
  2. Inspect at the defined stages
  3. Review the test records
  4. Raise and track non-conformities
  5. Issue the final inspection report

Applicable codes and standards

The applicable code or standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work. We confirm the governing document with you before the job starts.

The applicable standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work.

Deliverables and reporting

  • Stage-wise inspection records
  • Non-conformity reports
  • Final inspection summary

Scope limitations and site requirements

  • Covers the stages and items in the agreed plan
  • Inspection supports quality and does not replace the manufacturer's own responsibility

Frequently asked questions

When is QA/QC inspection useful?
During fabrication or repair, where quality needs checking at each stage.
Do you also do NDE?
Yes, NDE is part of our inspection capability.
ISO 9001:2015Certified quality management
On-time complianceESIC, PF and MLWF awards
Safety firstPPE and LOTO kits in use
60+ page reportsDetailed documentation per project
IBR-certified weldersFor boiler pressure parts

Planning a shutdown or facing a breakdown?

We know your urgency. Tell us the problem and we will plan the right testing.

Send an enquiry
Send enquiry