We know your urgency. Call us: +91 98554 45055
Vishwakarma Technical Services (VTS)
Pune, India · RLA & NDT specialists
Home / Services / Line Auditor Services
Quality, Audit and Consulting

Line Auditor Services

Auditing of inspection and fabrication lines for quality and consistency.

Service overview

Our line auditors review how inspection and fabrication work is being carried out along a production or repair line, and check that procedures are followed and records are complete.

Purpose and industrial applications

  • Checking production and repair lines
  • Verifying that procedures are followed
  • Supporting client or customer audits

Components and materials

  • Procedures and work instructions
  • Inspection and test records
  • Equipment and calibration status

Inspection methods and equipment

  • Witnessing of work on the line
  • Review of records and procedures

See our equipment

Typical procedure

  1. Agree the audit scope
  2. Review procedures and records
  3. Observe the work
  4. List findings
  5. Report and follow up

Applicable codes and standards

The applicable code or standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work. We confirm the governing document with you before the job starts.

The applicable standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work.

Deliverables and reporting

  • Audit report with findings
  • Follow-up recommendations

Scope limitations and site requirements

  • An audit samples the work and cannot cover every item
  • Scope is limited to the lines and period agreed

Frequently asked questions

How is it different from NDE line auditing?
NDE line auditing focuses on NDE practice. Line auditor services can cover wider inspection and fabrication activities.
How often should lines be audited?
It depends on the work and the client's quality system.
ISO 9001:2015Certified quality management
On-time complianceESIC, PF and MLWF awards
Safety firstPPE and LOTO kits in use
60+ page reportsDetailed documentation per project
IBR-certified weldersFor boiler pressure parts

Planning a shutdown or facing a breakdown?

We know your urgency. Tell us the problem and we will plan the right testing.

Send an enquiry
Send enquiry