Service overview
A Remaining Life Assessment (RLA) estimates how much safe service life is left in boiler and pressure vessel components. It combines inspection data, metallurgical examination and operating history, so repair and replacement can be planned instead of forced.
Purpose and industrial applications
- Ageing boilers and pressure vessels nearing the end of design life
- Planning shutdowns, repairs and replacement
- Supporting decisions to continue, repair or replace
Components and materials
- Boilers, heaters and pressure vessels
- Superheaters, economisers and air pre-heaters
- Boiler tubes, headers and drums
- Steam pipes, weld joints and pressure parts
Inspection methods and equipment
- Thickness and hardness surveys
- In-situ metallography and replication
- Oxide scale measurement where applicable
- NDT such as UT, MPI and DPT
Typical procedure
- Collect design, operating and repair history
- Inspect and test the selected components
- Examine the material condition on site
- Assess the data against the applicable methodology
- Report the findings with recommendations
Applicable codes and standards
The methodology depends on the equipment type, material, operating history and the requirements of the Indian Boiler Regulations (IBR) or other applicable regulations. We agree the basis with you at the start.
The applicable standard depends on the equipment, material, service conditions, statutory requirements and the approved scope of work.
Deliverables and reporting
- Detailed project report of 60+ pages, with inspection data, photographs, micrographs and analysis
- RLA report with tabulated findings
- Test data and micrographs
- Remaining life estimate and its stated basis
- Recommendations for repair, replacement or continued service
Scope limitations and site requirements
- The estimate depends on the quality of the data and the locations examined
- Future operating conditions are assumed to stay close to the past ones
- It is an engineering assessment, not a guarantee of life
Frequently asked questions
When should a boiler have an RLA?
Commonly when it reaches the end of its design life, after long high-temperature service, or when you plan life extension. We can advise for your equipment.
How long does an RLA take?
It depends on the size of the plant and the access available. We plan it with your shutdown schedule.
ISO 9001:2015Certified quality management
On-time complianceESIC, PF and MLWF awards
Safety firstPPE and LOTO kits in use
60+ page reportsDetailed documentation per project
IBR-certified weldersFor boiler pressure parts
Planning a shutdown or facing a breakdown?
We know your urgency. Tell us the problem and we will plan the right testing.